FILIPPO FAVARO Digital Product DesignerHMI & Industrial UX
Let’s talk

Available For new engagements

Services · How I can help

Three ways to hire the designer behind a plant-management platform running in 40+ countries. For product teams shipping industrial and B2B software. For machine builders with an HMI people have to run a shift on. For studios that need a senior product designer under their own name.

SVC 01

Product design for industrial and B2B software

A senior product designer embedded with the team that ships a plant-management platform, an industrial IoT product, a production dashboard or a data-heavy B2B tool.

For

Product teams and their owners — the people responsible for a platform that plant managers, operators and service engineers open every morning, and who need design that keeps pace with a roadmap instead of arriving after it.

What you get

  • The information architecture and the data model argued, not assumed: what the people on the floor, in the office and on the phone actually need to see, in what order.
  • Screens with every state drawn — loading, empty, degraded, alarmed — so a developer never has to invent one.
  • A design system the team keeps after I leave: tokens, components, the rules for extending it.
  • Reviews inside the build, not after it. Handoff is the middle of the job.
  • A mobile companion where the work leaves the office — designed as one system with the desktop, not a second product.

Shape

Embedded, by the month, on a fixed number of days a week; or a fixed-scope project when the problem is already framed.

Proof

SCM Digital PortalTescam

SVC 02

HMI and machine-interface design

The screen on the machine, designed with the people who run it: from a review of what you have to a full interface system your HMI developers can build without a meeting.

For

Machine builders — packaging, plastics, machine tools, automotive, medical, process equipment — with a screen that operators fight with, or a new machine that needs one, and a team that has designed for gloves, glare, noise and a €400,000 machine that must not stop.

What you get

  • Discovery on the floor with the operators, the maintenance crew and the people who buy the machine — what each of them needs to see, and when.
  • The operating model before the screens: states, alarms and their priority, recovery paths, who sees what.
  • The screen system with every state drawn — running, degraded, alarmed, recovering — and a spec kit your HMI developers can build from.
  • Review rounds after first build, on the machine.
  • Or start smaller: a written review of the interface you have, with the fixes ranked by risk and effort, and an HMI guideline document your team designs against from then on.

Shape

Fixed scope, agreed after discovery; a review on its own is measured in weeks. One fence, stated plainly in the questions below.

Proof

Low level interfacesStrato

SVC 03

Senior design capacity for studios

Product design and, where needed, production front-end for design and development studios — white-label, under your brand, inside your process.

For

Studios and agencies with an industrial, enterprise or data-heavy client and nobody senior on product design this quarter. Particularly Northern European studios whose clients build machines, plants and the software around them.

What you get

  • A senior product designer on your client calls as your team — your name on the work.
  • The same build kit your client would get from an in-house lead: flows, every state, specs, a design system your developers can extend.
  • Production-ready front-end when the studio needs it: I build what I design.
  • Reserved capacity once we have shipped together — days held for you each month, whether or not a project is live.

Shape

By the day for a first project; by the month once we know each other. Fully white-label; NDA as standard.

Proof

A development process from nothingStrato

Not sure which of the three it is?

Thirty minutes and I will tell you — or tell you it is none of them, and who to ask instead.

Book a 30-min call

How it runs

  1. A conversation, not a proposal. Is this worth solving, and am I the right person for it.
  2. The problem framed before it is priced. What "done" means, in writing, before any number.
  3. Design in cycles, in the open. You see every loop, tested with the people who will use it.
  4. Delivery as a build kit, and I stay through the build. Specs, states, a design system — and the review calls after.

How an engagement runs, in full →

Questions

Do you work under NDA?

Yes, whenever a client wants one. Some shipped work is shown here in full — the SCM Digital Portal, as it runs today — and some, like Bridgestone’s, only as a schematic; the case studies say which is which, and the rest I can walk through on a call.

Remote or on site?

Remote by default, from Venice, on Central European time. On the plant floor for discovery and for the first build review, anywhere in Europe.

Which languages do you work in?

English and Italian, both to the level where the operators and the board get the same sentence. For Northern European studios and product teams, English is the working language.

How is an engagement structured?

Three shapes: a fixed-scope project once the problem is framed, an embedded role by the month on a set number of days a week, or day-based capacity for studios. The shape is agreed on the first call; the number follows the framing.

What do you need from us to start?

One person who owns the product, time with three people who actually use it, and the current screens, however rough. The rest I go and find.

Do you code?

Enough to ship a production front-end — Strato is mine end to end — and enough to write a specification your developers will not need to interpret.

How soon can you start?

The availability line in the navigation is kept current. A review can usually start within weeks; an embedded role is planned a month or two ahead.

Is there anyone you do not work for?

Woodworking machinery manufacturers — that is my employer’s market, and I keep it whole. Every other sector is open: packaging, plastics, machine tools, automotive, process and medical equipment, and the software teams and studios that serve them.

What if it is not working out?

Two weeks in, either of us can stop, and you keep everything produced so far. That has not happened yet, and the clause is there so that nobody has to hope.

Sign-Offs

The last column on an operation sheet is a signature. These are the people who led the teams the work was built with — their words, from their reference letters.

OP 10· Telebit

At first his job was the mockups in Figma and the matching templates and assets in Angular. With a great deal of work to do and few people to do it, he confidently took on the front-end developer’s job as well — components, services and modules in Angular — and worked closely with the back-end team through integration and testing.

Andrea SalvadoriSenior full-stack developer & team coordinator, TelebitReference letter, March 2022 · translated from ItalianSIGNED OFF

OP 20· IFIN Sistemi

His workload spanned from the designing of new components and assets for the various software application produced by our company to the complete review and restructuring of our development process, introducing the agile scrum methodology and fitting it perfectly with our existing flow. […] As a designer, he was always on time with the deliveries and often gave better results.

Mario Mirco La MattinaTeam leader, IFIN SistemiReference letter, Padua, January 2023SIGNED OFF

Contact

Sitting with one of these?

Ready to build something meaningful together? Share a bit about your project and team, and I’ll get back to you within 48 hours.

Machine builders, product teams and studios: three ways to work together, from an HMI to white-label overflow — see services.